Tippecanoe Middle School Renovation Project

  • On April 9, 2018 the Tipp City BOE approved moving forward with the Renovation project of Tippecanoe Middle School and LT Ball Intermediate School. These projects are being funded with our current Permanent Improvement levy.

    The projects being undertaken at Tippecanoe Middle School include:

    • Replacement of the electrical switchgear
    • Addition of a VRF HVAC system for the entire building that will provide cooling and heating
    • Addition of a rooftop HVAC system for the gymnasium that will provide cooling and heating for the gymnasium space
    • Addition of a new fire alarm system
    • Replacement of all interior lights with an LED lighting system
    • Additional parking lot and exterior lights
    • Roof work - the areas of the existing roof (28,800 sq ft) that are not covered by a Durolast membrane system will be completed
    • Replacement of all windows, curtain walls, and exterior doors
    • Security upgrades (additional cameras and door blast film)
    • Upgraded building automation controls
    • Replacement of Master Clock system
    • Replacement of PA system
    • Complete refinishing of gymnasium floor
    • Replacement of all network switches
    • Upgrade of Wifi network